The local authorities (Bordeaux Métropole with the Bruges and Le Bouscat town councils) put on their thinking caps, and soon came up with an idea to embellish the area in a way that also tied in with the Métropole’s "55 000 hectares pour la nature" programme aimed at incorporating and preserving nature and greenery in amongst new urban developments. The "Ligne verte" project quickly took shape!
The first major challenge though was simply reaching the start of the green line at Ravezies. The area located by what used to be the station is a car park that is a Tetris-style mass of automobiles that has to be ploughed through Indiana Jones-style to reach the path, which at this point in time is not signposted.
The entrance is... somewhere in the background of this shot! |
Wooden barriers have been positioned at the entrance to the walk, and a handful of surviving poles, buffers and raised platforms serve as a reminder of the place’s past life. Before setting off, I attempted to replicate the photo I’d taken in 2012 around the time when the station was decommissioned.
Above: the view in 2012. |
The same view today... |
There was soon another reminder of the path’s railway heritage with the "petit train de Ravezies", a small wooden steam train/play area designed for children to get a train driver’s eye view of the track! (See picture at top of article.) The former lines remain visible, embedded into the surface of the path, and before long the walkway passed under a series of metal arches that previously held the overhead electric cables.
Another brand new children’s play area appeared, this time comprising swings, a hut and a slide, although this particular blogger got a bit more excited about the nearby sight of "le bassin de stockage des eaux de pluie Béquigneaux", one of the Métropole’s many defences against flooding in the area, there to stock excess rainwater whenever required, as detailed in a previous Invisible Bordeaux item about the network of "detention basins". The Béquigneaux flood plain, created in 1987, is an extensive beast, and can reportedly stock up to 102,800 cubic metres of water.
Part of the magnificent (and reassuringly dry) Béquigneaux flood plain. |
From then on, the disused railway line reappears and the path runs alongside it until, when reaching a bend, it comes to an abrupt, unexpected and, yes, premature end. There was no choice other than to leave the pathway, which I was happy to find naturally leads into the Gourribon housing estate, which has already enjoyed a starring role on the blog. By winding back towards the former railway line, there were promising signs that a further stretch of the green line appears to be in the making, and that will ultimately link up this area with Le Bouscat’s avenue de la Libération. The information panel on display promised that this "Phase 5" would be complete in 2020, but I think we’re all collectively prepared to provide extra leeway to anything that should have been delivered in 2020…
The "green line" comes to a sudden and unspectacular end here. |
Information panel promising an additional stretch. |
> Find it on the Invisible Bordeaux map: former Ravezies railway station, place Ravezies, Bordeaux (departure point).
> Cet article est également disponible en français !
0 commentaires: