As 2017 draws to a close, the time has come to look back over the year on the blog. Usually this involves simply highlighting the most-r...

The 2017 Invisible Bordeaux Awards: and the winners are…


As 2017 draws to a close, the time has come to look back over the year on the blog. Usually this involves simply highlighting the most-read items or personal favourites, but this time around Invisible Bordeaux has decided to organize its own awards ceremony, so congratulations to all the winning subjects who will be delighted to be enjoying some more exposure!

The “Best-Kept Secret” Award: Jardin des Remparts
It’s small and not exactly spectacular, but the Jardin des Remparts is a charming haven of tranquillity in one of Bordeaux’s busiest quarters, located just a few metres away from Capucins Market. And, with a curious shrine, a ghostly sentry post and remains of the 14th-century city walls, there is also a definite sense of history about the place.


The “Most Opaque” Award: the bricked-up windows of Bordeaux
Is there anything more opaque than a window that has been bricked up? And it just so happens that there are hundreds, if not thousands of these bricked-up windows in Bordeaux! Why should that be and what are the various distinguishing features of these architectural oddities? Invisible Bordeaux investigated!


The “Most Travelled” Award: cycling along the Canal de Garonne
Instead of a road-trip, this tale was one of a towpath trip along the banks of the Canal de Garonne from Castets-en-Dorthe to Agen. Starring locks, barges, trees, bridges, aqueducts, various types of vegetables and fruit and, bizarrely, models of French landmarks built out of matchsticks, the scenic bike ride also included a memorable non-encounter with a painting by the Dutch master Rembrandt. Get pedalling! 


The “Bizarre Public Artwork” Award: la Maison aux Personnages
One of Bordeaux’s most unusual permanent art installations is a custom-built house located on a traffic island, comprising a number of rooms, each of which has been designed and filled with scenery and accessories to look like it is inhabited by an imaginary character. The piece is the work of Russian artists Ilya and Emilia Kabakov. It’s all very strange, and is just a little bit controversial too...


The “Inconvenient Truth” Award: the 1942 Juif et la France exhibition
Bordeaux’s wartime history remains a sore subject and, in hindsight, one the most painful chapters from that period was this, the hosting of an anti-Semitic propaganda exhibition. Wartime events of the like now seem to be the unbelievable end-product of some unrecognisable parallel universe. And yet it is all so recent and the setting so familiar that the account makes for chilling reading.


The “Live Event” Award: Domaine Catros Heritage Days tours
Of course, most blog-related public appearances in 2017 came in the shape of more performances of the Shuman Show, the words-and-music live show based on the life and career of Mort Shuman, in front of audiences in Bordeaux, Mérignac, Talence, Saint-Aubin-de-Médoc and even Paris! But this year's award goes to an event that was put on with the support of my daytime employer Thales: I was given the keys to the Domaine Catros arboretum on the premises of our former facility in Le Haillan and held guided tours as part of this year’s European Heritage Days weekend. A splendid time was had by all! 


Thank you for following the Invisible Bordeaux story so far, and see you again in 2018!


1 commentaires:

A few weeks ago, I picked up a pamphlet that was produced around 1960 and which provided a full overview of the ambitious project to bui...

Back when the Pont d’Aquitaine was still the ‘Nouveau Pont de Bordeaux’


A few weeks ago, I picked up a pamphlet that was produced around 1960 and which provided a full overview of the ambitious project to build a suspension bridge over the Garonne between the Bacalan quarter of Bordeaux and Lormont. The bridge, referred to at the time as the “Nouveau Pont de Bordeaux”, went on to be inaugurated in 1967 and is now a familiar local landmark: the Pont d’Aquitaine. 

Of course, the bridge was already the subject of a full Invisible Bordeaux report a few years ago, along with a video clip taking in the view from the cycle paths! But what more would I learn from this unusual fold-out pamphlet, credited to Ponts et Chaussées de la Gironde and comprising an impressive amount of originally handwritten data and information, along with a series of pre-computer age technical illustrations and cartography? And how did the technical drawings and maps compare with the finished product, 50 years on from completion? 

For a start, the financial structure of the project is detailed. The bridge itself and the left-bank viaduct were set to cost 97 million “nouveaux francs” (France had just switched systems) which, when accounting for inflation (using calculation methods developed by national statistics institute Insee), represents around 154 million euros in today’s money. The French State was delivering on two-thirds of the budget, while the Gironde département and the city of Bordeaux split the remainder in two. Throw in the right-bank connecting road and the bridge amounted to a 100-million-franc project.

The document also lists the quantities of the main raw materials that would be needed to build the bridge. To highlight but a few, these included 132,000 cubic metres of ordinary and reinforced concrete, 8,500 tons of steel for the reinforced concrete, 1,900 tons of cables for the support and suspension system and 4,350 tons of rolled steel for the bridge's main framework. In its initial configuration, the surface area of the bridge and viaduct amounted to 25,000 square metres.

This is one of the things which may have changed over time: as specified in the pamphlet, the bridge originally comprised 2x2 lanes for road traffic (equating to a width of 14 metres), with 40-centimetre-wide reservations separating them from 1.50-metre-wide cycle paths on either side, in turn coupled with additional 1.10-metre-wide footpaths. When the suspension structure was overhauled between 2000 and 2005, the deck was extended to 2x3 lanes; as a result automobile traffic took up all the available space between the pylons. The cycle path was now aligned with the pylons; when reaching the pylons, the path was diverted, snaking around the pillars on newly-added platforms. The footpaths had already disappeared in 1980 (freeing up space for a "fifth" central lane of traffic) and today the bridge very much remains a non-pedestrian zone.

Cross-section of the original deck, showing the cycle paths and footpaths on either side.

This is how it translated into reality: note the pedestrians over to the right! Picture taken soon after the bridge opened by blog reader Jean-Claude Déranlot. Thanks Jean-Claude!
The cycle path (which lies just behind the red barriers) now loops around the exterior of the pylons.

Leafing through the technical drawings, it does look as if the design of the top of the pylons must have been revised ahead of construction, with slightly slimmer horizontal sections connecting the vertical pillars on the finished product.


Reassuringly, the engineers’ calculations regarding the viaduct’s 4.66% gradient and the curvature of the suspension system translated seamlessly into reality.




The deck now spills over the edge of the structure (where the cycle path passes) when it must have been perfectly aligned in the bridge's original configuration.
Some of the diagrams, such as this one of the left-bank foundation block, almost offer an x-ray view of the real thing, although it looks like the system towards the top may have been modified during the renovation period a few years back, or possibly even during urgent maintenance and repair work carried out in the 1980s.


The pamphlet also provides a cross-section view of the bridge's original suspension cables, each of which was made up of 37 individual cables that were 78.5 millimetres in diameter. Elsewhere in the document, it is explained that those individual cables comprised 208 4.7-millimetre steel wires. In all, each 48cm x 55cm suspension cable weighed in at 1.15 ton per metre. During the 21st-century renovation, all that changed was the diameter of the individual cables (72.6mm) and associated steel wires (127 4.1 mm wires), along with the overall size of the suspension cables (45cm x 51cm).


A close-up view of one of the sealed suspension cables, at one of the points where it is clamped to the bridge, and the point where it enters the foundation block pictured further up the page.
Finally, while the bridge itself is still, at the time of writing in 2017, a highly recognisable result of those early-1960s designs, one thing which has changed considerably is the surrounding road infrastructure. Take, for instance, the lowly roundabout which would have provided an initial means of connecting traffic to and from Bordeaux and the bridge with the “futurs boulevards extérieurs” (now lovingly referred to as the Bordeaux Rocade) which has, over time, become a complex spaghetti junction notably fed by traffic from the busy Bordeaux Lac business, exhibition, hotel and retail park.

The way it was planned in the 1960s and the way it is now (via Googlemaps): the humble roundabout has become a spaghetti junction.
All of which brings us back to the present-day Pont d’Aquitaine, the Bordeaux suspension bridge which isn’t doing so badly for a 50-year-old! Despite the arrival of leaner, more fashionable counterparts spanning the Garonne, and even though it will never quite have the picture-postcard cachet of the Pont de Pierre, the Pont d’Aquitaine still stands tall and proud, enjoying its prominent status as the main gateway between the city and the Gironde Estuary which lies beyond (a little further downstream), and providing the final physical means of crossing the river ahead of the Atlantic ocean.

 
> Locate it on the Invisible Bordeaux map: Pont d'Aquitaine, Bordeaux/Lormont
> Ce dossier est également disponible en français !
> Big thanks to Frédéric Llorens for the additional information about when the pedestrian footpaths were removed. 
> And check out the exclusive Invisible Bordeaux guide to the view from the bridge!

0 commentaires: